Chronoblog
Ahhh… cracked plaster, how I’ve missed you.
27 OCTOBER 2013
Ahhh… Cracked Plaster, how I’ve missed you.
Another small dust storm touched down at 76 Melbourne
Street. Specifically, I began taking out
awkwardly-placed bi-fold closet doors, and flipping the closet space towards
the master bedroom. Good thing I have
patient, flexible, and helpful co-inhabitants here. Marta as feng-shui consultant. And william the helper and observer. Even without the closet renovation, the
project is justified in the couple of hard-earned moments of bravery, as Willy
stood by as I cut a couple studs with the sawzall. Loud enough to panic a tyke of 2-1/2
years? Nope, he stood by and found my
shoulder, and saw both rattling cuts through.
Later: running to mama pronouncing loudly “I was very brave!” Man!
There is a lot going
to happen in a small space, and hopefully a short amount of time:
- Air sealing and insulation of the closet ceiling (previously just layered plaster lath and drywall.)
- Conversion of the bi-fold doors to a recessed bookshelf
- Bringing the closet forward about 18” into MBR. Installation of sliding doors
- NOT exposing or dressing the chimney, ala glossy architecture magazine
- Reservation of space for split-zone Air Source Heat Pump unit (upper space in closet.
- Creation of A/V chase and feed to an LCD projector (to watch the Lord of the Ring in high def.)
Stay tuned for more updates, onward with the hammers!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment